{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

{ITEM_IMAGE_ALT}

Shepherd's Garden Heritage

Shepherd's Garden Heritage

Manshield Construction is currently under construction of Shepherd’s Garden Heritage for Shepherd’s Care Foundation. 

This 15 storey steel structure with Hambro MD 2000 floor system with a 2 level 80,000 SF steel parkade is clad with panelized exterior wall from Durabond.

Eden House 8 storey long-term care facility for assisted living and SLD4. rooftop patio and common areas accessible.

Project Info

  • Client:
    Shepherd's Care Foundation
  • Project Location:
    Edmonton, Alberta
  • Sector:
    Residential - Multi-Tenant
  • Role:
    General Construction - Design Build
  • Constructed in:
    2016
  • Project Schedule:
    25 Months
  • Budget:
    $49.5 Million