Faraday School - Foundation Repair

Structural reinforcing of the existing school floor system underneath school within the existing crawlspace.  

Includes new floor sheathing, flooring, and drywall touch-ups to south most classroom after foundation repairs were completed.  

Manshield were contracted to tunnel underneath the existing school, install new piles, pilecaps, and concrete piers, re-shape existing crawlspace, installation of new crawlspace drainage system, and remove existing crumbling foundation.

Project Info

  • Client:
    Winnipeg School Division No. 1
  • Project Location:
    Winnipeg, Manitoba
  • Sector:
    Institutional
  • Role:
    Construction Management
  • Constructed in:
    2012
  • Project Schedule:
    2 Months
  • Budget:
    $1.5 Million