LEED Silver Certified this project was a joint venture between the University of Winnipeg and the Plug In Gallery. At 51,000 SF,  and at a cost of  $12 million, this fast-tracked project was completed on time and on budget in just 12 months using an Integrated Project Delivery Method.

Manshield was the Construction Manager and was responsible for the design assistance and construction  of this four-storey, eco-friendly building as well as the demolition of the former Army Navy Store.

Significant value engineering initiatives were undertaken over the course of design development.

Project Info

  • Client:
    University of Winnipeg
  • Project Location:
    Winnipeg, Manitoba
  • Sector:
    Institutional
  • Role:
    Construction Management/Design Assist
  • Constructed in:
    2009-2010
  • Project Schedule:
    12 Months
  • Budget:
    $12 Million