{ITEM_IMAGE_ALT}

Bedford Village Phase 3

{ITEM_IMAGE_ALT}

Bedford Village Phase 3

{ITEM_IMAGE_ALT}

Bedford Village Phase 3

{ITEM_IMAGE_ALT}

Bedford Village Phase 3

{ITEM_IMAGE_ALT}

Bedford Village Phase 3

{ITEM_IMAGE_ALT}

Bedford Village Phase 3

Bedford Village - Phase Three

Manshield Construction is currently under construction of Bedford Village Phase 3 for Christenson Developments. 

This 5 storey building is non combustible and built with light weight steel load bearing steel stud walls and the Hambro D-500 floor system

Main Floor will house assisted living & commercial retail units and the building under construction will be tied into a Phase 2 which is a wood structure.

Project Info

  • Client:
    Christenson Developments
  • Project Location:
    Sherwood Park, Alberta
  • Sector:
    Residential - Multi-Tenant
  • Role:
    General Construction - Design Assist
  • Constructed in:
    2016
  • Project Schedule:
    18 Months
  • Budget:
    $12.78 Million